Back to Execution Archive

Sheraton Skyline Hotel Conference & Banqueting Refurbishment

Heathrow, London£45,000+Live/Occupied Building

Key Takeaways

Project Value

£45,000+

Programme Window

Sept - Dec 2024

Site Type

Live Hospitality Environment

Scope

Conference & Banqueting Areas

Project Gallery

Sheraton Skyline Hotel Conference & Banqueting Refurbishment gallery image 1
Sheraton Skyline Hotel Conference & Banqueting Refurbishment gallery image 2

Project Overview

Scope of Works

Falcon completed survey-led flooring refurbishment works across conference and banqueting zones including the Paris Room, main corridor and lobby interfaces, staircase treads and risers, lift lobby areas, and reception rug zones. Delivery included substrate and finish condition assessment, phased uplift planning, threshold and trim standardisation, contract-grade carpet system recommendations, and detailing for compliant transition and stair safety in a live hotel operation.

Technical Challenges & Solutions

  • - Existing installations used mixed fixing systems, including gripper and direct-bond methods, creating inconsistency in performance and maintenance.
  • - Threshold details varied across timber, marble, brass, and aluminium, requiring a unified specification for safety and visual continuity.
  • - Stair and circulation zones required upgraded nosing and finishing standards while maintaining guest operations and controlled phased access.

The Results

The works were delivered to programme with strong quality feedback from site leadership and hotel operations teams. The completed package improved safety, consistency, and durability across high-traffic conference and circulation areas while maintaining live-site continuity.