Project Value
£1,600
Key Takeaways
Project Value
£1,600
Scope
5 Bedroom Carpet Replacement
Delivery Pace
Completed in 90 Minutes
Building Status
Live Hospitality Site
Project Gallery

Project Overview
Falcon completed uplift and disposal of direct-stick carpet finishes across five bedrooms, including bully strip removal after room clearance, and installed replacement edge foam-back carpet systems to the same areas. Waste was controlled by Falcon operatives with recyclable offcuts segregated and returned for processing where possible.
The package was delivered in one day, with installation works completed in approximately 90 minutes on site, and handed over defect-free with full quality documentation. Falcon maintained pace and quality under constrained access and achieved a smooth operational delivery.
London (EC2R 8AQ)
7 Princes Street London Banking Refurbishment
£20,000+
Gloucester
Denmark Road High School Drama Studio, MI Room & Accessible WC
£3,900
Swansea East, Neath
Holiday Inn Express Swansea East Breakfast Area
£2,600
London Heathrow (M4/J4)
Premier Inn London Heathrow Airport (M4/J4) Reactive Corridor Replacement
£1,200
Luton Airport
Premier Inn Luton Airport Reactive Bathroom Subfloor & Vinyl Replacement
£1,000
Oxford Kidlington (Airport)
Premier Inn Oxford Kidlington Airport Reactive Bedroom Replacement
£1,000
West London
Prince Consort Village
£385,000+
Heathrow, London
Sheraton Skyline Hotel Conference & Banqueting Refurbishment
£45,000+
Bromsgrove, Worcestershire
South Bromsgrove High School Flooring Refurbishment
£95,000+
Strawberry Fields
Strawberry Fields Flat 3 Stairs & Landings Replacement
£1,500
Leamington Spa
The White Horse Leamington Spa Refurbishment
£15,000+
Coleshill, Birmingham
Trajan Hill Soft Flooring Package
£50,000+